20091113

Basement Plumbing

So the basement floor area has now been filled with small grey rocks (henceforth known as gravel), and the plumbing for the bottom story has been placed within aforementioned sediment.


The places for in-floor footings have been dug in the gravel, and the pipes and basement have all been pre-treated for termite prevention.



The floor pour should happen over the weekend. Lot of work accomplished for 3 weeks of construction.

No comments:

Post a Comment